輕鋼結構建筑作為“綠色建筑”的優秀代表

網址:www.wasumo.com  2022-11-05  作者:admin    閱讀:

輕鋼結構建筑作為“綠色建筑”的優秀代表,幾乎滿足了所有人的要求,那么輕鋼別墅究竟是如何建成的?
As an excellent representative of "green building", the light steel structure building has almost met the requirements of everyone. How was the light steel villa built?
1
one
溝通設計方案
Communication design scheme
根據客戶房子的地勢情況、及客戶需求和喜好,設計出全套別墅圖紙,力求可以為客戶建造一個即能避免浪費又能舒適居住的輕鋼房屋。
According to the terrain of the customer's house, and the customer's needs and preferences, a full set of villa drawings are designed to build a light steel house that can avoid waste and live comfortably for the customer.
圖片
picture
2
two
全自動設備生產輕鋼龍骨
Production of light steel keel with fully automatic equipment
設計圖紙確定下來,就要開始進行輕鋼龍骨的生產。所有結構構件均為輕鋼生產工廠精密機械流水線冷壓成型,以毫米級的尺寸精度,規范有序流水線的工廠操作,即可保證產品質量又能節省生產時間。
After the design drawings are determined, the production of light steel keel will begin. All structural members are cold pressed by precision mechanical assembly line of light steel production plant. With millimeter size accuracy, the factory operation of orderly assembly line is standardized, which can ensure product quality and save production time.
按照1層100m住房所需4噸鋼材計算,不用1天就可以完成,而且輕鋼龍骨通過打印完成,“干法”作業施工過程0建筑垃圾,節能又環保!
Based on the calculation of 4 tons of steel required for a 100m housing on the first floor, it can be completed in less than one day, and the light steel keel is printed. The construction process of "dry method" operation is zero construction waste, which is energy saving and environmental protection!
圖片
picture
3
three
打地基
Foundation
輕鋼結構房屋自重輕,一般情況條形基礎或整版基礎均可,需要平整的水泥地基,就可以進行輕鋼結構的安裝。
Light steel structure houses have light weight. Generally, strip foundation or full plate foundation can be used. If flat cement foundation is required, light steel structure can be installed.
圖片
picture
4
four
拼裝主體龍骨
Assembling main keel
組裝一層墻體拼接二層樓面u型槽模具 井蓋鋼模具 保定雅思 一次性止血帶 保定養老院  保定水處理設備 一次性止血帶梁組裝二層墻體→搭建二層屋面/屋頂連接組裝方式,基礎部分采用螺栓連接,角柱和組合柱設置有抗拔螺栓,沿墻體水平方向按照一定構造間距設置抗剪螺栓 ,確保房屋與基礎穩固連接。
Assemble the first floor wall and splice the second floor beam to assemble the second floor wall → erect the second floor roof/roof connection assembly method. The foundation part is connected by bolts. The corner column and composite column are provided with anti pull bolts. Shear bolts are set along the horizontal direction of the wall at a certain structural spacing to ensure the stable connection between the house and the foundation.